Construction Environmental Management Plans
Early Works section (South of Olympic Highway to Table Top)
In accordance with the project’s Conditions of Approval an environmental management plan was prepared for the construction of the early works section of the project. Construction of this section, between Bells Rd interchange and Table Top, commenced in April 2007. The Early Works Environmental Management Plan (EWEMP) details the environmental safeguards that will be implemented during construction. The plan also includes the mitigation measures to be implemented to manage the potential environmental impacts that construction works may have on the surrounding environment. In addition to the EWEMP, there is a project Urban Design and Landscape Plan and a Community Involvement Plan. These plans have been incorporated in the Construction Environmental Management Plan and the Urban Desgin and Landscape Plan that covers the whole project.
Copies of the documents are available for viewing at the community display centre at 15335 Hume Highway (on the corner with Knox Road).
Woomargama to Table Top
A Construction Environmental Management Plan (CEMP) has been prepared for the whole project, between Woomargama and Table Top. This plan has been approved by the Department of Planning and incorporates the Conditions of Approval that apply to the section of the project between Woomargama and Mullengandra and between Mullengandra and Table Top. A number of sub-plans have been prepared in accordance with the condtions, to ensure appropriate environmental management plans of specific aspects of the project. These plans detail the environmental safeguards that will be implemented during construction. The plans also include the mitigation measures to be implemented to manage the potential environmental impacts that construction works may have on the surrounding environment. These include:
|
TYPE |
TITLE |
PUBLISHED |
SIZE |
 |
Spoil Management Plan
|
6/01/2009
|
1647 KB
|
 |
Traffic Management and Road Safety Management Plan
|
21/01/2008
|
311 KB
|
 |
Heritage Management Plan
|
6/05/2008
|
4839 KB
|
 |
Air Quality Management Plan
|
6/01/2009
|
3710 KB
|
 |
Framework Construction Environmental Management Plan
|
6/01/2009
|
869 KB
|
 |
Flora and Fauna Management Plan
|
6/01/2009
|
7430 KB
|
 |
Groundwater Management Plan
|
6/01/2009
|
248 KB
|
 |
Construction Riparian Management Plan
|
2/02/2009
|
795 KB
|
 |
Soil and Water Management Plan
|
6/01/2009
|
3664 KB
|
 |
Stormwater Management Plan
|
6/01/2009
|
1934 KB
|
 |
Construction Waste Management Plan
|
29/01/2009
|
187 KB
|
 |
Noise and Vibration Management Plan
|
6/01/2009
|
4071 KB
|
|
TYPE |
TITLE |
PUBLISHED |
SIZE |
 |
Knox Road Site Compound EMP
|
21/01/2008
|
516 KB
|
|
TYPE |
TITLE |
PUBLISHED |
SIZE |
 |
Olympic Highway to Table Top, UDL panels 1-4, May 2007
|
10/10/2007
|
5932 KB
|
 |
Mullengandra to Olympic Highway, UDL panel 5, July 2007
|
28/08/2007
|
2383 KB
|
 |
Mullengandra to Olympic Highway, UDL panel 6, July 2007
|
28/08/2007
|
1169 KB
|
 |
Mullengandra to Olympic Highway, UDL panel 7, July 2007
|
28/08/2007
|
1482 KB
|
 |
Mullengandra to Olympic Highway, UDL panel 8, July 2007
|
28/08/2007
|
1221 KB
|
 |
Mullengandra to Olympic Highway, UDL panel 9, July 2007
|
28/08/2007
|
3291 KB
|
 |
Urban Design and Landscape Report, March 2008, Part 1 of 3
|
10/04/2008
|
20195 KB
|
 |
Urban Design and Landscape Report, March 2008, Part 2 of 3
|
14/04/2008
|
13676 KB
|
 |
Urban Design and landscape Report, March 2008, Part 3 of 3
|
14/04/2008
|
10538 KB
|
|
TYPE |
TITLE |
PUBLISHED |
SIZE |
 |
Biannual Compliance Report, November 2007
|
21/02/2008
|
1710 KB
|
 |
Biannual Compliance Report, May 2008
|
2/09/2008
|
1672 KB
|
 |
Biannual Compliance Report, November 2008
|
14/01/2009
|
1791 KB
|
 |
Biannual Compliance Report, May 2009
|
5/06/2009
|
986 KB
|
 |
Biannual Compliance Report, October 2009
|
18/02/2010
|
893 KB
|
Copies of the documents are available for viewing at the community display centre
at 15335 Hume Highway (on the corner with Knox Road).
|